10.1. AVAILMENT OF BUILDING PERMIT
ABOUT THE SERVICE:
Section 301 of the National Building Code states that No person, firm or corporation, including any agency or instrumentality of government, shall construct, alter, convert, use, occupy, move, demolish, and add a building/structure or any portion thereof or cause the same to be done, without first obtaining a Building Permit from the Building Official assigned in the place where the subject building/structure is located or planned to be located.
Any person desiring to obtain a building permit and any ancillary / accessory permit/s together with said Building Permit and any ancillary/application/s on the prescribed applications forms as stated in the Latest Implementing Rules and Regulation of the National Building Code of the Philippines (PD 1096).
The permit becomes null and void if work does not commence within one year from the date of such permit, or if the building is abandoned or work is suspended for a period of 120 days.
CLIENT GROUPS:
Any person, firm or corporation, including any agency or instrumentality of government, who intends to construct, alter, convert, use, occupy, move, demolish, and add a building/structure or any portion thereof or cause the same to be done.
DOCUMENTARY REQUIREMENTS FOR BUILDING PERMIT APPLICATION
(Single Dwelling Residential / Commercial/Industrial/Others)
- Documentary Requirements Checklist
- Four (4) copies of filled – up Unified Application Form for Building Permit
- Fire Safety Evaluation Certificate (FSEC) from Bureau of Fire Protection
- One (1) photocopy of Current Real Property Tax Receipt
- One (1) certified copy of Tax Declaration
- One (1) certified copy of Original Certificate of Title (OCT) / Transfer certificate of Title (TCT), or Deed of Absolute Sale or Lot Locational Plan from LRA (if lessee, Contract of Lease)
- Four (4) sets of Ancillary Permit Forms, Survey Plans, design plans, specifications and other documents as follows: (signed and sealed by designing professionals)
- Architectural Documents
- Civil Documents
- Sanitary Documents
- Plumbing Documents
- Electrical Documents
- Mechanical Documents
- Electronics Documents
- Geodetic Documents
- Fire protection Plan (if applicable)
- Three (3) photocopies of Valid Licenses (PRC ID) of all involved professionals
- Notarized estimated value of the building / structure to be erected as declared by the owner
- Construction Safety and Health Programs from DOH
- Affidavit of Undertaking
- Soil Test
- Structural Design Analysis
One (1) copy of Clearance from other government agencies exercising regulatory functions such as:
- HLURB – for zoning and land use of all types of building/structure.
- CZAO – City Zoning Administration Office for Locational Clearance
- Bureau of Fire Protection – for all types of buildings/structures
- DPWH – Road Right of Way Clearance along national road for all types of building/structures.
- PEO – road right of way clearance along provincial road for all types of building/structures
- LGU – for all types of buildings/structures
- DENR-EMB Clearance (ECC/CNC) – for all commercial and industrial buildings
- DOLE – for industrial buildings
- DOH – for health hazard-related buildings / structures
- ATO – for buildings / structures exceeding 40 meters in height
- Philippine Tourism Authority – for tourist-oriented projects
- Department of Education – for educational buildings
- Energy Regulatory Board – for gasoline stations.
To facilitate processing, please take note of the following before submitting the plans and other requirements above to the CEO:
- Requirements of the Revised 2005 National Building Code (PD 1096) & its Implementing Rules and Regulations
- Laws and City Ordinances affecting the design/project
- Requirements of the referral codes (Architectural Code, Philippine Electrical Code [PEC]. Revised Plumbing Code, Structural Code [NSCP] Mechanical Engineering Code [PSME]
- Compliance with BP 344 (Accessibility Law) should be indicated in detail on plans for commercial, institutional and public buildings
- If setback/yard requirements are not met on the sides and at the back/rear the Firewall (strictly no opening) extending up to at least 1 meter from the roof level shall be provided. It shall be indicated on the site development plan with owner’s conformity.
- Grease Trap/Oil Separators shall be provided for hotels, restaurants, eateries, terminals, gasoline station, auto repair shops, bakeries and other similar establishments
- All revisions/addition made in the plans shall have an acknowledgement of the designer.
- Special Power of Attorney/Authority to construct shall be provided if the owner is not the signatory in all application forms, plans and documents.
- Forms and Letters, Plans, Specifications, Bill of Materials and Cost Estimates and other pertinent documents must be signed and sealed by the Designer and signed by the Owner.
- All application forms and letters must be properly filled-up with all necessary information available.
SERVICE SCHEDULES:
Monday to Friday,
8:00 AM to 5:00 PM
TOTAL PROCESSING TIME:
30 minutes
PROCESS OF AVAILING THE SERVICE:
Steps Involved | Action of the City Engineer’s Office | Transaction Time | Total Fees/ Charges | Responsible Person/s |
Pre-evaluation of Documentary Requirements | ||||
1. Submit Application Form and Documentary Requirements | Receives documents and verifies completeness of plans and gives an endorsement to other offices / agencies for securing other required clearances | 20 minutes | Please refer to the Revised Edition of National Building Code 2005. (NCBDO MEMORANDUM CIRCULAR NO. 1, Series of 2004 – New Schedule of Building Permit Fees and Other Charges)
| SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I
|
2. Secure an order of payment after the application has been determined to be complete and in order. | Issues an order of payment | 5 minutes | JOELAN D. AGUIRRE Engineer IV/ Acting Building Official | |
3. Proceed to the Office of the City Treasurer, pay the required fees and submit photocopy of Official Receipt to Office of the City Engineer | Receives photocopy of Official Receipt and notify client for the date of release | 5 minutes | SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I
| |
4. On scheduled date, proceed to the Office of the City Engineer and receive the approved building permit | Releases the approved building permit | 10 minutes | SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I
|
10.2. AVAILMENT OF PERMITS SUPPLEMENTARY TO A BUILDING PERMIT
ABOUT THE SERVICE:
The following permits are required to secure a building permit:
Ancillary Permits
The Ancillary Permits duly signed and sealed by the corresponding professionals and the plans and specifications shall be submitted together with duly notarized application for Building Permit. The Building Permit is null and void if not accompanied by the Ancillary Permits. The prescribed Ancillary and other Accessory Permits/forms shall likewise be used whenever applicable. The Ancillary Permits are the following:
- Architectural Permit
- Civil / Structural Permit
- Electrical Permit
- Mechanical Permit
- Sanitary Permit
- Plumbing Permit
- Electronics Permit
Accessory Permits
Accessory Permits are issued by the Building Official for accessory parts of project with very special functions or use which are indicated in the plans and specifications that the building permit application. These may include, among others: bank and record vaults; swimming pool; firewalls separate from the building/structure; towers; silos, smokestacks; chimneys’ commercial/industrial fixed ovens; industrial kilns/furnaces; water/waste treatment tanks, septic vaults; concrete and steel tanks; booths, kiosks and stages; and tombs, mausoleums and niches.
Accessory Permits are issued by the Building Official for activities being undertaken prior to or during the processing of the building permit. The coverage is spelled out in the accessory permit form including the expiry period. These shall be signed by the owner/s applicant and by the concerned professionals. These permits include, among others, ground preparation and excavation, encroachment of foundation to public area, fencing, for fence not exceeding 1.80 meters high, sidewalk construction, temporary sidewalk enclosure and occupancy, erection of scaffolding, erecting, repair, removal of sign; and demolition.
CLIENT GROUPS:
Individual, firms or corporations seeking a building permit
REQUIREMENTS:
Fencing Permit
This permit is secured prior to actual construction of fence.
Requirements:
- Fencing Permit Form (NBC Form No. B-03) – 4 copies duly signed and sealed and notarized
- 4 copies of signed and Sealed Fencing Plan by designing professional
- 4 copies of signed and sealed Bill of Materials and Cost Estimates by designing professional
- 4 copies of signed and sealed Specifications by designing professional
- Certification of a Geodetic Engineer that the proposed fence will not encroach on adjoining properties based from the approved survey plan
- 1 copy of Transfer Certificate Title (TCT) / Original Certificate Title (OCT) (Electronic/ certified copy)
- 2 copies of Deed of Sale/Lease Contract/Contract to Sell, if the OCT/TCT is not in the name of the owner / applicant (notarized / certified copy)
- Certificate of Real Property Tax Payment / Current Tax Receipt – 1 copy
Demolition Permit
This permit is secured prior to systematic dismantling or destruction of a building or structure in whole or in part.
Requirements:
- 4 copies duly signed and sealed and notarized Demolition Permit Form (NBC Form No. B-08)
- 4 copies of Floor Plan with Geodetic Certification of no encroachment and vicinity map
- 1 copy of Certified true copy of Latest Tax Declaration
- 1 copy of Certificate of Real Property Tax Payment / Current Tax Receipt
- 1 copy of Electronic Copy of OCT / TCT
Permit for Temporary Service Connection
This permit is secured for temporary service connection to a power utility for lighting and power construction, testing etc.
Requirements:
- 3 copies of Permit for Temporary Service Connection Form (NBC Form No. E-03)
- 3 copies of Building Permit (for new construction)
- 3 copies Electrical Plan / Layout
Temporary Sidewalk Enclosure and Occupancy Permit
This permit is secured prior to the construction, enclosing / utilizing sidewalk
Requirements:
- 3 copies of Temporary Sidewalk Connection and Occupancy Permit Form (NCB Form No. B-05)
- Sketch Plan of sidewalk to be constructed / repaired or enclosed.
- Road right-of-way clearance from concerned agency
Scaffolding Permit
This permit is secured whenever the erection of scaffolding occupies street lines.
Requirements:
- 4 copies of Scaffolding Permit Form (NBC Form No. B-06)
- 4 copies of Sketch Plan of street line to be occupied
Sign Permit
This permit is secured prior to the installation, erection, attachment painting of any form of signage.
Requirements:
- 4 copies duly signed and sealed and notarized Sign Permit Form (NBC Form No. B-07) – 4 Copies duly signed & sealed and notarized
- Building Permit Form whenever there is a concrete / steel structure
- 1 copy of duly signed and sealed Structural Analysis
- Zoning Clearance
- Electrical Permit (NBC Form No. A-03) whenever there is an electrical connection – 4 copies duly signed and sealed
- Fire Clearance whenever there is an electrical connection
- Location / Vicinity Plan / Site Development Plan
- Lot documents whenever it occupies a private lot
- DPWH clearance (for national roads / highways) and Provincial Engineer Office Certificate
- 4 copies of duly signed and sealed Specifications and Cost Estimates
- 1 copy of Certified true copy of Latest Tax Declaration
- 1 copy of Certificate of Real Property tax payment / Current Tax Receipt
- Certified Copy of Contract of Lease, if not owned
Excavation and Ground Preparation Permit
This permit is secured prior to ground preparation and excavation after the building line is established.
Requirements:
- 4 copies of Accomplished Excavation and Ground Preparation Permit Form
- 4 copies of Foundation Plan with detailed drawings sketch Plan
SERVICE SCHEDULES:
Monday to Friday,
8:00 AM to 5:00 PM
TOTAL PROCESSING TIME:
35 minutes
PROCESS OF AVAILING THE SERVICE:
Steps Involved | Action of the City Engineer’s Office | Transaction Time | Total Fees/ Charges | Responsible Person/s |
Pre-evaluation of Documentary Requirements | ||||
1. Accomplish the forms and submit the same along with other requirements | Assesses and evaluates the submitted documents | 20 minutes | Please refer to the Revised Edition of National Building Code 2005. NCBDO Memorandum Circular No. 1, Series of 2004 – New Schedule of Building Permit Fees and Other Charges)
| SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I
|
2. After the documents have been found to be complete and in order, secure an order of payment | Issues an order of payment | 5 minutes | JOELAN D. AGUIRRE Engineer IV/ Acting Building Official | |
3. Proceed to the Office of the City Treasurer, pay the required fees and submit photocopy of Official Receipt to Office of the City Engineer | Receives photocopy of Official Receipt and notify client for the date of release | 5 minutes | SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I
| |
4. On scheduled date, proceed to the Office of the city Engineer and receive the approved building permit | Releases the approved building permit | 5 minutes | SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I |
10.3. AVAILMENT OF A CERTIFICATE OF FINAL ELECTRICAL INSPECTION (CFEI)
ABOUT THE SERVICE:
A Certificate of Final Electrical Inspection (CFEI) is required before any building/structure is used or occupied. It is usually secured after the completion of electrical installation and is a requirement in securing power service connection forms the Sorsogon II Electrical Cooperative.
It is also required if there is any change in the existing use or occupancy classification of a building / structure or any portion thereof.
Sec. 1.2.2.2 of Philippine Electrical Code states that no electrical installation, alteration and or/addition shall be connected or reconnected to any power supply or any source of electrical energy without a CFEI obtained from the Government Authority Concerned.
CLIENT GROUPS:
Individuals, firms or corporations seeking an Certificate of Final Electrical Inspection (CFEI)
REQUIREMENTS:
- Location / Sketch Plan of Electrical Layout for 1-9 outlets only of not more than 1,620 VA for indigenous dwellings
- Electrical Permit (NBC Form No. A-03)
- Electrical Plans – as built ( signed and sealed by Professional Electrical Engineer
- Electrical Specifications
- Certificate of Completion
- Inspection Report from City Inspectors
- Proof of Lot Ownership (TCT/ Deed of Sale/ Barangay Certification/Tax Declaration)
SERVICE SCHEDULES:
Monday to Friday,
8:00 AM to 5:00 PM
TOTAL PROCESSING TIME:
25 minutes
PROCESS OF AVAILING THE SERVICE:
Steps Involved | Action of the City Engineer’s Office | Transaction Time | Total Fees/ Charges | Responsible Person/s |
1. Present the required supporting documents to any member of the building staff for initial verification of the requirements | Verifies all necessary documents appropriate | 10 minutes | Please refer to the Revised Edition of National Building Code 2005. (NCBDO MEMORANDUM CIRCULAR NO. 1, Series of 2004 – New Schedule of Building Permit Fees and Other Charges)
| JOSE NOLI P. JARABO Electrician II
Electrical Aide Engineering Aide |
2. After the documents/ requirements and or corrections have been found to be complete and/or in order, secure an order of payment. | Issues an order of payment | 5 minutes | JOELAN D. AGUIRRE Engineer IV/ Acting Building Official | |
3. Proceed to the Office of the City Treasurer and pay the required fees and submit photocopy of Official Receipt to CEO | Receives photocopy of Official Receipt and notify client for the date of release | 5 minutes | SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I | |
4. Secure approved Certificate of Final Electrical Inspection | Releases approved certificate of final electrical inspection |
5 minutes |
Engineering Aide |
10.4. AVAILMENT OF OCCUPANCY PERMIT
ABOUT THE SERVICE:
An occupancy permit is required before any building / structure is used or occupied. It is usually secured after the completion of a structure.
It is also required if there is any change in the existing use or occupancy classification of a building, structure or any portion thereof.
CLIENT GROUPS:
Individuals, firms or corporations who wish to occupy a newly completed structure or one that has changed existing use or occupancy classification.
DOCUMENTARY REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY APPLICATION (Single Dwelling Residential / Commercial/Industrial/Others)
- Documentary Requirements Checklist
- Filled –up Unified Application Form for Certificate of Occupancy
- Three (3) copies of Certificate of Completion, duly notarized
- One (1) copy Construction Logbook, signed and sealed by the Owners, Architect or Civil Engineer who undertook full-time inspection and supervision
- Three (3) sets of As-built Design Plans and specifications duly signed and sealed by all involved Professionals ( if cases when there are changes in the approved plans)
- Architectural Documents
- Civil/Structural Documents
- Electrical Documents
- Mechanical Documents
- Sanitary Documents
- Plumbing Documents
- Electronics Documents
- Geodetic Documents
- Fire protection Plan (if applicable)
- One (1) copy of the valid licenses of all involved Professionals (e.g. Professional Tax Receipt and the Professional Regulation Commission Identification card)
- Photograph of the completed structure showing front, sides, and rear areas
- Fire Safety Inspection Certificate (FSIC)
- Yellow Card issued by Electrical Service Provider
SERVICE SCHEDULES:
Monday to Friday,
8:00 AM to 5:00 PM
TOTAL PROCESSING TIME:
35 Minutes
PROCESS OF AVAILING THE SERVICES:
Steps Involved | Action of the City Engineer’s Office | Transaction Time | Total Fees/ Charges | Responsible Person/s |
Pre-evaluation of Documentary Requirements and conduct advance ocular inspection. | ||||
1. Submit Application Forms and Documentary Requirements
| Receives documents and verifies completeness of plans and gives an endorsement to other offices / agencies for securing other required clearances | 20 minutes | Please refer to the Revised Edition of National Building Code 2005. (NCBDO MEMORANDUM CIRCULAR NO. 1, Series of 2004 – New Schedule of Building Permit Fees and Other Charges)
| SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I |
2. Secure an order of payment after the application has been determined to be complete and in order. | Issues an order of payment | 5 minutes | JOELAN D. AGUIRRE Engineer IV/ Acting Building Official | |
3. Proceed to the Office of the city Treasurer, pay the required fees and submit photocopy of Official Receipt to Office of the City Engineer | Receives photocopy of OR and notify client for the date of release | 5 minutes | SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I | |
4. On scheduled date, proceed to the Office of the City Engineer and receive the approved building permit | Releases the approved building permit | 5 minutes | SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I |
10.5. AVAILMENT OF A CERTIFICATE OF ANNUAL ELECTRICAL INSPECTION AND CERTIFICATE OF ANNUAL INSPECTION FOR BUSINESS LICENSE AND MAYOR’S PERMIT
ABOUT THE SERVICE:
Business Enterprises are required to secure a Building Inspection Approval from the City Engineer’s Office before the start of commercial operations and during the annual renewal of business permits. This service is among the processes involved in securing Mayor’s Permit / Business License.
CLIENT GROUPS:
Business enterprises intending to start commercial operations or Intending to renew their business permits.
REQUIREMENTS:
New Business License / Mayor’s Permit:
- Location / Sketch Plan with detailed information about business
- Photo Copy of Certificate of Occupancy / Certificate of Use with attached copy of Certificate of Final Electrical Inspection
- Certificate of Annual Inspection for Building / Mechanical Permit and Electrical Inspection Report
Renewal of Business License / Mayor’s Permit:
- Photo Copy of Certificate of Occupancy / Certificate of Use with attached copy of Certificate of Annual Inspection for Building and Certificate of Annual Electrical Inspection
- Certificate of Annual Inspection for Building / Mechanical Permit and Electrical Inspection Report
SERVICE SCHEDULES:
Monday to Friday,
8:00 AM to 5:00 PM
TOTAL PROCESSING TIME:
25 minutes
PROCESS OF AVAILING THE SERVICES:
Steps Involved | Action of the City Engineer’s Office | Transaction Time | Total Fees/ Charges | Responsible Person/s |
Pre-evaluation of Documentary Requirements | ||||
1. Submit Application Forms and Documentary Requirements
| Receives documents and verifies completeness | 5 minutes | Please refer to the Revise Edition of National Building Code 2005. (NCBDO MEMORANDUM CIRCULAR NO. 1, Series of 2004 – New Schedule of Building Permit Fees and Other Charges)
| SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I |
2. Secure an order of payment after the application has been determined to be complete and in order. | Issues an order of payment | 5 minutes |
| JOELAN D. AGUIRRE Engineer IV/ Acting Building Official |
3. Proceed to the Office of the City Treasurer, pay the required fees and submit photocopy of Official Receipt to Office of the City Engineer | Receives photocopy of OR and notify client for the date of release | 5 minutes |
| SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I |
4. On scheduled date, proceed to the Office of the City Engineer and receive the approved building permit | Releases the approved building permit | 10 minutes |
| SHERYLL H. LAGCO Building Inspector
MARIA SALOME D. JOLO Engineer I |